All Tenders


Sr No. Office Section/ Division NIT No. Subject/ Particulars Issued On Last Date Download
301All India RadioEngineeringENGP-Digitalization of Studio-Balaghat/11ST/18-19ACOSTIC WORK, B TYPE TREATMENT FALSE CEILING ETC. AT DIGITISATION OF BALAGHAT 2019-01-082019-01-29Download
302All India RadioEngineeringENGP-Digitalization of Studio Surat/18-19Acoustic treatment painting, polishing and other work, in studios of AIR, Surat. 2019-01-082019-01-29Download
303All India RadioEngineeringENGP-Digitalization of Studio Godhra/18-19Acoustic treatment painting polishing and other work in studios of AIR Godhra.2019-01-082019-01-29Download
304All India RadioEngineeringENGP- Refurbishing of Studio Rewa/11TR/Acoustic Rewa/18-19Acoustic Treatment work at Drama and Music studios of AIR, Studio Site REWA.2019-01-082019-01-29Download
305All India RadioEngineeringADG E SZ /PUR/31/SRMST/2018-19Extension of due date E-Tender enquiry for Repairs/ Renovation works of 100 M Self Supporting Tower at AIR, Karimnagar 2019-01-072019-01-23Download
306DoordarshanEngineeringCorrigendum to NITCorrigendum to NIT-6/2018-192019-01-042019-03-01Download
307All India RadioEngineering18/AE(E)/Kol/2018-19/635CORRIGENDUM-Partial Renovation of Internal Electrical Wiring i/c P and F LED fittings in DDG-E Room and Announcers Rest Room and AC plug point in Room No.62, 63 and Archives and separate power supply2019-01-042019-01-15Download
308All India RadioEngineeringSPECS 10KW FM TX 9 4 2014 D Extension AD E PnD Unit DG AIR Akashvani Bhawan New Delhi Sub Draft specifications for supply of 10 kW 1 plus 1 Digital Compatible VHF FM solid State MOSFET technology based broadcast trans2019-01-032019-01-08Download
309All India RadioEngineeringP/1/E-Tender/RF cable tray connector and Earthing/ Muzaffarpur/18-19Supply and Fixing of new RFS make EIA connector and coupling element, Fabrication, Erection Testing and Commissioning of Horizontal Cable Tray. Copper plate earthing for 10 KW AIR FM Transmitte 2019-01-032019-01-18Download
310All India RadioEngineeringKol-E/2017-2018/3 4/11821.Comprehensive annual maintenance for VRF air conditioning. 2.Maintenance of electrical installation, operation of pump sets and DG sets at SRFTI, Kolkata. SH - Supply of electrical materials. 2019-01-032019-01-21Download

.
© Copyright 2018, Website Content Managed by Prasar Bharati (IT Division).
Last Updated on 16/04/2019